#1 Amicable Credit per WU is doubled temporarily
Posted: Tue Mar 28, 2017 6:14 am
It appears that current work units are 2 times slower on average, so I've set credit per WU to 3236.07 temporarily (2 times more than usual). This is until the project reaches 50%, when a whole new type of WU will start, so I'll revise credit per WU once again then.
https://sech.me/boinc/Amicable/forum_thread.php?id=53